CLP International New Energy Holding Co., Ltd. Invited 2016 Infrastructure Engineering Equipment (Tenth Batch (Engineering Elevator Bid, Retractable Electric Butterfly Valve, Electric Butterfly Valve, and Expansion Section Bid), Sixth Batch (Deyang and Ti

Tender No.: Tender Notice No. Tender Code: CBL_20161116_188929254
Bulletin category: Domestic tender

Tenderee: CLP International New Energy Holdings Co., Ltd. Source of funding: Other CLP International New Energy Holding Co., Ltd. Inviting bids for infrastructure construction equipment in 2016 (Tenth Batch (Equipment for the construction of elevators in front of the plant, telescopic electric butterfly valves, electric butterfly valves, and Expansion Lot Bid), the sixth batch (bundled boiler blower bids for two projects in Deyang and Tieling) and second bidding public notice tender announcement entrusted by the tenderee to CLP International New Energy Holdings Co., Ltd. 2016 Tenders for infrastructure construction equipment (the tenth batch of supplementary tenders) were open tendered.
I. Basic Information of the Project Tenderee: CLP International New Energy Holdings Co., Ltd.

Second, the scope of tender
1. List of tender bids

No.

Tender number

Section name

Quantity

main indicators

Bidding Document Price (yuan)

Note

1

C99004815SZ02SB022-120540000001

Plant front area engineering elevator

4

4 elevators

1000.00

2

C99004815SZ02SB022-120540000002

Telescopic electric butterfly valve, electric butterfly valve and expansion joint

1

Provides 8 sets of electric butterfly valves (with detachable double flange transmission joints), 8 sets of electric butterfly valves with expansion joints, 4 sets of KRVB short body flange type silent check valves and 1 set of directly embedded elastic seat sealing gate valves. Corresponding counter-flanges, mounting bolts, electrical controls and other textually required distribution facilities, as well as professional tools and spare parts

1000.00

3

C99004815SZ02SB022-120540000003

The second batch of the second batch (Boiler fan of two projects in Deyang and Tieling)

1

Including primary blower, secondary blower, induced draft fan, furnace wall cooling blower and furnace wall cooling induced draft fan that are matched with two incineration lines of two projects, including fan body and its driving device, fan inlet adjusting device, frequency conversion or permanent magnet Speed ​​adjusting device and auxiliary equipment

1000.00

2. Main Construction Contents III. Qualification Requirements for Bidders (1) Basic Qualification Requirements
1. The bidder shall be a registered company in China with independent legal personality.
2. With a perfect quality management system, it must hold an ISO9001 quality management system certification issued by a nationally recognized quality organization or an equivalent quality management system certification.
3. In the last three years, no bad behavior such as fraudulent bid winning and serious breach of contract has occurred.
4. Not being ordered to suspend business, property was taken over, frozen and bankruptcy.
5. Has good bank credit and business reputation, operating in good condition.
6. There is no real or potential conflict of interest between the bidder and the bidder.
(II) Special qualification requirements

No.

Section name

Special qualifications

1

Plant front area engineering elevator

1. The qualifications of professional contractors for the installation of "Special Equipment Manufacturing License of the People's Republic of China" issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China and the "Special Equipment Installation and Maintenance License of the People's Republic of China" are classified into one class;

2. Performance requirements: Within five years, the bidder must have produced two or more elevator performances similar to the specifications of this bid, and should have two or more years of successful operation experience;

3. The elevator supplier must have a maintenance unit or office at the project location and provide relevant certification materials;

4. Do not accept consortium bids.

2

Telescopic electric butterfly valve, electric butterfly valve and expansion joint

1. Performance: The bidder shall have the performance of the same or similar equipment for an environmental protection power station with a capacity of 500t/d and above or a thermal power unit with a capacity of 300MW within the next five years.

2. Commonwealth bids are not accepted.

3

The second batch of the second batch (Boiler fan of two projects in Deyang and Tieling)

1. The bidder has at least two or more performances in the same or similar facilities with a capacity of 500t/d or above for waste-to-energy plants or 300MW capacity for thermal power units in the country in the past five years.

2. Commonwealth bids are not accepted.

IV. Issues on the Offering of Bidding Documents (I) Time and Place of Sale of Bidding Documents
From November 16, 2016 to November 23, 2016 (excluding official holidays), from 9:00 to 11:30 in the morning and from 13:30 to 17:00 in the afternoon.
(2) The price of the bidding documents shall be paid for the bidding documents in order to purchase the bidding documents. For the details of the bidding documents, please refer to the “List of Tender Bid Sections”. The bidding documents are purchased voluntarily. Once sold, the fees will not be refunded.
(3) The way of selling tender documents will be on-line and it will not accept on-site purchases. (.)
1. Purchase the bidding documents to perform the following operations: 1. The netizen login → 2. Search announcement → 3. Check the details of the announcement → 4. Select the participation bid, fill in the online “Buy Bidding Document Application Form” → 5. Pay the bidding document fee. Please refer to the website's operating instructions for the purchase of tender documents.
2. Payment method: UnionPay online payment.

Contact: Zhang Jie

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

5G Integrated Lithium Ion Battery

5G Integrated Battery,51.2V Battery System,Integrated Lithium Ion Battery,Backup Lithium Ion Battery

Wolong Electric Group Zhejiang Dengta Power Source Co.,Ltd , https://www.wldtbattery.com

This entry was posted in on